The existing HVAC system was replaced throughout the school with the exception of the most recent addition, consolidating the school's
HVAC into one central boiler and chiller. The site design includes both the expansion of the bus parking to accommodate 17 buses and the
addition of a car parking lot for 125 cars. The existing fire alarm system was upgraded to comply with current building code requirements.